Data center hardware that loses OEM support in 2026

Every Dell, HPE, Cisco, IBM and NetApp model in our EOSL library with a 2026 end of service life date: the ones already past, the ones still ahead, and the source for each.

Published 4 min readData: our EOSL library

Share
models with a 2026 EOSL date
43
of them Dell. Cisco 13, IBM 6, HPE 4, NetApp 3.
17
dates from the OEM's own notice
19
until the next date, Oct 31, 2026
1 mo

43 models in our EOSL library have a 2026 end of service life date. 35 have passed it and 8 are still ahead. On that date the OEM stops selling support contracts for a model. The table below lists each one by date, with the source for the date.

The 8 still ahead in 2026

What EOSL means for a box in production

End of service life is the date the manufacturer stops selling support contracts for a model. The hardware keeps running. What goes away is the OEM parts depot and the OEM engineers for that model. After that date, a failed drive or controller is your problem unless someone else holds the spares.

What you can do before the date

Refresh early
You buy new hardware on the OEM calendar instead of your own.
Self-spare
You buy used parts from brokers and fix it in-house. It works until the part you need is the one no broker has.
Third-party maintenance
We support these models 3 to 5+ years past EOSL with a 4-hour on-site SLA. Price maintenance or find parts.

EOSL dates by month

July has the most, with 17. February, April, June and September have none.

EOSL dates per month, 2026. Source: Datacenterservices.ai EOSL library.

All 43 models, by EOSL date

Showing 43 of 43 models.

Where the dates come from

19 of these 43 dates come from the OEM's own lifecycle notice. 24 come from two or more independent EOSL databases that agree. Dates can change, so confirm them for your serial numbers. Each model page has a free email alert 12 months before its EOSL date and again on the date.

Short answers

Which data center hardware reaches end of service life in 2026?

43 models in the Datacenterservices.ai EOSL library have a 2026 end of service life date: Dell 17, Cisco 13, IBM 6, HPE 4, NetApp 3. 35 of those dates have passed. The next is Oct 31, 2026, for Cisco ASR 1013, Cisco Catalyst 2960-L, Cisco Catalyst 3650 and Cisco Meraki MX84.

What happens when data center hardware reaches EOSL?

The OEM stops selling support contracts for the model. The hardware keeps running, but OEM parts and engineers are no longer available for it. Third-party maintenance providers such as Datacenterservices.ai support these models for 3 to 5+ years past the EOSL date, with a 4-hour on-site SLA.

Where do these EOSL dates come from?

19 of the 43 dates come from the OEM's own lifecycle notice. 24 come from two or more independent EOSL databases that agree. Each row in the table shows its source, linked where one is on file. Dates can change, so confirm them for your serial numbers.

Share

Got a model on this list?

Maintenance 3 to 5+ years past EOSL with a 4-hour on-site SLA. Refurbished parts, each through a 21-point test.