models reach EOSL in 2028
53
of them Cisco. Dell 16, HPE 14, NetApp 6.
17
dates from the OEM's own notice
30
until the first date, Mar 31, 2028
18 mo

53 models in our EOSL library reach end of service life in 2028. On that date the OEM stops selling support contracts for them. The table below lists each one by date, with the source for the date.

What EOSL means for a box in production

End of service life is the date the manufacturer stops selling support contracts for a model. The hardware keeps running. What goes away is the OEM parts depot and the OEM engineers for that model. After that date, a failed drive or controller is your problem unless someone else holds the spares.

What you can do before the date

Refresh early
You buy new hardware on the OEM calendar instead of your own.
Self-spare
You buy used parts from brokers and fix it in-house. It works until the part you need is the one no broker has.
Third-party maintenance
We support these models 3 to 5+ years past EOSL with a 4-hour on-site SLA. Price maintenance or find parts.

EOSL dates by month

July and October have the most, with 14 each. January, February, April, June and September have none.

EOSL dates per month, 2028. Source: Datacenterservices.ai EOSL library.

All 53 models, by EOSL date

Showing 53 of 53 models.

Where the dates come from

30 of these 53 dates come from the OEM's own lifecycle notice. 23 come from two or more independent EOSL databases that agree. Dates can change, so confirm them for your serial numbers. Each model page has a free email alert 12 months before its EOSL date and again on the date.

Short answers

Which data center hardware reaches end of service life in 2028?

53 models in the Datacenterservices.ai EOSL library have a 2028 end of service life date: Cisco 17, Dell 16, HPE 14, NetApp 6. The first date is Mar 31, 2028, for HPE ProLiant DL380 Gen10.

What happens when data center hardware reaches EOSL?

The OEM stops selling support contracts for the model. The hardware keeps running, but OEM parts and engineers are no longer available for it. Third-party maintenance providers such as Datacenterservices.ai support these models for 3 to 5+ years past the EOSL date, with a 4-hour on-site SLA.

Where do these EOSL dates come from?

30 of the 53 dates come from the OEM's own lifecycle notice. 23 come from two or more independent EOSL databases that agree. Each row in the table shows its source, linked where one is on file. Dates can change, so confirm them for your serial numbers.

Share

Got a model on this list?

Maintenance 3 to 5+ years past EOSL with a 4-hour on-site SLA. Refurbished parts, each through a 21-point test.